Episode 2 – Doing a carbon inventory

Adventures with an environment-conscious inner-urban community

November 2017

I received an email inviting me to a meeting with the Carbon Neutral Adelaide team. They were scoping out a number of sites for selection as a possible “Carbon Neutral Showcase Site” and Christie Walk was on the list.

This was very exciting.

An important goal at Christie Walk is to act as a sustainability model, to demonstrate what’s possible, and to motivate others to take action. Close cooperation with Carbon Neutral Adelaide would enhance that outreach work.

Read More

Episode 1 – In hot water again

Adventures with an environment-conscious inner-urban community

April 2016

Our apartment building (Sturt Apartments at Christie Walk) was nearly ten years old. It was time to start thinking about sustainability upgrades to reduce our carbon footprint.

Lighting was an easy place to start.

We worked with Adelaide lighting maintenance specialists Globebusters, who replaced unreliable CFL lights in our atrium stairwell and entranceway with long-life LED oyster lights and floodlights. In the courtyard, twin LED sensor floodlights replaced the old energy-hungry incandescent lights.

May 2016

Hot water; one of life’s great privileges. But our little luxury comes at a cost for us, and a carbon-cost for our warming planet. It’s a particular issue in our 4-level block of 13 apartments.

Read More

Aiming beyond NetZero at Christie Walk

Adventures with an environment-conscious inner-urban community

I’m fortunate to live at Christie Walk in Adelaide. It’s a community of 27 homes and gardens on 2,000m2. It was initiated by Urban Ecology Australia in 1999 as a demonstration project, to promote ecologically-sustainable and community-enhancing urban design and development.

The buildings range from stand-alone straw-bale homes to a 4-level apartment block, all designed for comfortable high-density but low-energy living.

Read More

Eco-city dreaming comes true

The facilitator asked us to do some dream-work.  That’s normally not so hard, but there we were, standing in an awkward-shaped T-allotment strewn with bits of broken glass and featuring some derelict out-buildings.  The site had previously been a city recycling depot and in a way one of our goals was to continue that recycling heritage.  We were asked to dream of what the features would be for our ideal sustainable-living community on the site. 

Read More
Solarstor thermal

New plans for solar thermal at Port Augusta

On 7th June 2016 another important step was taken towards decarbonising the South Australian economy. Solastor Australia announced detailed plans to build a solar thermal power station at Port Augusta.

In 2012 Dan Spencer reported for the New Internationalist:
“In July this year – faced with the closure of the coal plants – a community vote was held by a local group called Repower Port Augusta asking residents whether they wanted solar thermal or gas to replace the town’s coal stations.  Overwhelmingly the community voted 4053 to 43 for clean air, more jobs and the chance to see Port Augusta lead the country by building Australia’s first solar thermal power plants.”

Years passed and despite the enormous enthusiasm of the people of Port Augusta, and tireless activism, little physical progress was made.

After a long study, Alinta Energy announced in September 2015 that it wasn’t feasible for it to build a solar thermal plant to replace its coal-fired power stations. Closure had been expected some time between March 2016 and March 2018, but the end came quickly with the power stations shut down on May 9th 2016. South Australia lost a significant part of its baseload power-generating capacity without any commencement of building a replacement.

But despite that, the transition to a green economy is well underway in South Australia. 41% of the State’s electricity grid generation was powered by renewable energy in 2014/15. And the South Australian Low Carbon Economy Experts Panel reported to the South Australian Government in November 2015 that it is feasible for the State to reach net zero emissions by 2050.

Solastor

So this week’s announcement from Solastor Australia is tremendously important, particularly because the company is promising prompt action. They plan to build a grid-connected pilot plant at Port Augusta by the end of 2016, using scalable technology. The 1MW demonstration solar thermal power station will have several collector towers, each holding a 10 tonne block of graphite that can store the heat from the toroidal reflector mirrors for up to a week. Water circulating through tubing embedded in the graphite is converted to steam which then drives a turbine generator.

The full-scale grid-connected power station will have 1,700 collector tower modules and is expected to generate 110MW in winter and 170MW in summer.

Solastor envisages that this will be the first of many similar baseload solar thermal plants.

You can watch the Solastor Australia launch video on YouTube or on the New Internationalist Australia Facebook page.